Power Apps Fundamentals

A one-day hands-on programme for the business user who has heard Power Apps could replace a clunky spreadsheet-and-email process but has never built anything in it. Power Apps lets someone outside the IT department build a working approval form, request tracker or simple data entry app without writing conventional code, provided the data and the process are understood clearly before building starts.

The day is practical throughout. Participants connect to a data source, build screens and forms for a simple approval or request-tracking app, and wire in a Power Automate notification so the right person is alerted when something needs attention. The closing module is a frank look at governance: who should be building apps, what data loss prevention policies exist for a reason, and how unmanaged app sprawl becomes its own problem.

HRD Corp Training Provider Malaysia HRD Corp SBL-Khas Claimable

Programme Agenda

01

9:00 AM - 9:15 AM

Welcome and Programme Overview

Introduction to the session, objectives, and housekeeping.

02

9:15 AM - 10:15 AM

Canvas Apps Versus Model-Driven Apps

What each is built for, when a simple canvas app is the right tool, and when a structured model-driven app on Dataverse is worth the extra setup.

03

10:15 AM - 10:30 AM

Break

04

10:30 AM - 11:30 AM

Connecting to a Data Source

SharePoint lists, Excel tables and Dataverse as common starting points, and the practical differences in reliability and scale between them.

05

11:30 AM - 12:30 PM

Building Screens, Forms and Navigation

Laying out a simple app, building a form that captures the data correctly, and navigation between screens.

06

12:30 PM - 1:30 PM

Lunch

07

1:30 PM - 2:15 PM

Building an Approval or Request-Tracking App

A worked example built live: submitting a request, routing it for approval, and tracking its status through to completion.

08

2:15 PM - 3:15 PM

Basic Power Automate Integration

Triggering a notification or an email when a form is submitted or a status changes, without building a complex flow.

09

3:15 PM - 3:30 PM

Break

10

3:30 PM - 4:15 PM

Governance and Avoiding App Sprawl

Who should be building apps and why, data loss prevention policies and what they protect against, and keeping an inventory of what has been built so nothing becomes an orphaned, unsupported app.

11

4:15 PM - 4:45 PM

Applied Practice

Participants build a simple approval or tracking app for a real process from their own work.

12

4:45 PM - 5:00 PM

Wrap-Up and Q&A

Key takeaways, next steps, and close.

Key Outcomes

  • Choose between a canvas app and a model-driven app for a given business need
  • Connect a Power App to a SharePoint, Excel or Dataverse data source
  • Build screens and forms that capture data correctly
  • Build a working approval or request-tracking app
  • Add a basic Power Automate notification to an app
  • Apply governance practices that prevent uncontrolled app sprawl

Training Mode   Physical / Online / Hybrid / e-learning

HRD Corp   SBL-Khas Claimable

Level   Foundation, suitable for business users, operations and administrative staff who want to build simple apps without a programming background

Duration   1 Day (8 Hours)  |  9:00 AM to 5:00 PM

Venue   In-house at the client's premises, or delivered via the client's preferred platform (Microsoft Teams, Zoom, or equivalent)

Assessment   Hands-on practical tasks plus a 10 to 15 question knowledge assessment

Certificate   Certificate of Completion issued to all participants upon full attendance

Enquiries   Contact us to register or discuss scheduling

Frequently Asked Questions

Yes. Power Apps Fundamentals is HRD Corp SBL-Khas claimable. Employers registered with HRD Corp (PSMB) can claim the training fee against their levy, as Orbix Tech Sdn Bhd is an HRD Corp certified training provider. Submit the SBL-Khas application before the session date.

Power Apps Fundamentals runs for 1 day (8 hours) | 9:00 AM to 5:00 PM. It is delivered as an in-house closed group session, so the schedule can be adjusted to fit your team's working hours.

Yes. Delivery options are physical, online, hybrid, e-learning. In-house sessions run at your premises anywhere in Malaysia, online sessions run live over video conference, and hybrid combines both for teams split across sites.

Certificate of Completion issued to all participants upon full attendance. Each certificate carries a certificate number that can be checked at orbixtech.my/certificate-verify.

Level: Foundation, suitable for business users, operations and administrative staff who want to build simple apps without a programming background. The session is built around worked examples and group exercises rather than theory, so participants apply the material to their own organisation during the session.

Full-day sessions are quoted per session for a closed group, from RM 1,750. Advanced 2-day programmes are quoted per participant, from RM 4,000. All figures are before any HRD Corp levy claim.